Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinet Installation & Refacing in Oakland, CA
Kitchen remodeling with cabinet installation and refacing in Oakland typically costs between $3,500 and $22,000 depending on kitchen size, cabinet line, and whether you’re replacing boxes entirely or keeping the existing frames and updating the doors, drawer fronts, and veneer. Most Oakland kitchens we work on fall somewhere in that range, and we put the exact number in writing before anyone picks up a tool. If you’d like a flat written price for your kitchen, call (628) 300-4376 – estimates are free and come with a written scope, not a ballpark.
Cabinet work sits at the center of any real kitchen renovation. The cabinets set the layout, define the storage, and do more to establish the room’s character than almost anything else in it. Our Kitchen Remodeling in Oakland practice has delivered cabinet projects in kitchens ranging from narrow Temescal galley layouts to the larger open-plan spaces common in the Montclair and Rockridge neighborhoods, and the approach is the same every time: measure precisely, document what exists, price it honestly, and build it to hold up past the warranty period.
Grant Rowan started Rowan Construction Group in 2007 with a straightforward premise: the number on the quote is the number on the invoice, and if something changes, a signed change order precedes the work – not an apology afterward. That discipline is now formalized in the Haven Standard, and it applies to every cabinet installation and refacing job we take in Oakland.
When You Need Cabinet Installation & Refacing
- Drawer boxes and door hinges are failing repeatedly. When a drawer pulls free of its slide for the third time or a hinge strips out of particleboard that has swollen from years of Oakland fog and cooking humidity, repair stops making economic sense. That’s a structural cabinet problem, not a hardware problem.
- The layout no longer works for how you cook. Original cabinet configurations in Oakland homes built before 1990 were rarely designed around modern cooking habits – no pull-out trash, minimal lower storage access, upper cabinets that require a step stool for daily use. A full installation lets us redesign the layout rather than replicate it.
- You want a visual update without a full gut. If your cabinet boxes are structurally sound – no warping, no water damage to the substrate, doors that close square – refacing delivers a near-complete visual transformation at roughly 40 to 60 percent of the cost of new cabinet installation. We assess the frame condition honestly and tell you which path makes more sense for your specific boxes.
- Water damage has compromised the lower cabinet substrate. Under-sink cabinet boxes in older Oakland homes frequently show MDF substrate that has delaminated after years of minor plumbing leaks. Refacing doesn’t address that; installation of new lower boxes does. We photograph the condition of every cabinet interior before recommending a scope.
- You’re pre-listing and need the kitchen to show better. Oakland’s real estate market rewards updated kitchens visibly. Refacing with new hardware and updated door profiles is one of the higher-return-per-dollar improvements a seller can make before listing, particularly in neighborhoods like Fruitvale and the Upper Dimond where homes move on condition as much as location.
- The existing layout wastes corner and overhead space. Blind corner cabinets that don’t use a pull-out system, soffits boxing in overhead space that could hold additional uppers, or a peninsula configuration that blocks natural light – these are layout problems that only a full installation addresses properly.
Our Cabinet Installation & Refacing Process

- Site measure and condition assessment. Before we quote anything, we measure the kitchen precisely – wall lengths, ceiling height, window and door clearances, plumbing and electrical rough-in locations. We also inspect the existing cabinet boxes: frame material, substrate condition, signs of water intrusion, and whether the wall framing is plumb enough to accept new cabinets without shimming. Every measurement and finding goes into a written record, and you receive a photo set of the existing conditions. This is standard on every visit, not something you pay extra for.
- Written price and scope delivery. Under Clause 1 of the Haven Standard, you receive a flat written price with a line-item scope before any work begins. For cabinet installation, that scope names the cabinet line (we source from KraftMaid and Wellborn, among others), door style, finish, hardware allowance, and any associated work – removal of existing cabinets, patching of walls, countertop coordination. For refacing, it specifies the veneer material, door profile, drawer front dimensions, and hardware. No item is lumped into a vague “labor” line.
- Cabinet selection and order confirmation. Once the price is signed, we work through the selection with you – door profiles, finish, interior organization options like pull-out shelves or soft-close hardware. We order only after you’ve confirmed the selections in writing, which eliminates the most common source of mid-project change orders in cabinet work: a customer who wanted a different finish seeing it for the first time when the boxes arrive. If something does change after order, a signed change order precedes any adjustment.
- Existing cabinet removal and wall preparation. For full installation, existing cabinets come out carefully – we separate reusable hardware and notify you of anything behind the walls worth documenting, including plumbing or electrical that the original installer may have routed through cabinet space. Walls are patched and leveled where cabinets removed. For refacing, we clean and lightly sand the existing frames, check every box for square, and address any soft spots in the substrate before the veneer goes on.
- Installation and alignment. Upper cabinets go in first, anchored to wall studs with appropriate fasteners – not drywall anchors. We use a laser level to establish the run line and check plumb on every individual box before moving to the next. Lower cabinets are shimmed to level across the full run before any scribing or toe-kick work begins. Doors are hung and adjusted for reveal consistency before we photograph the finished installation. We don’t call a cabinet job done until every door gap is uniform and every drawer closes flush.
- Punch-list, photo documentation, and warranty delivery. At completion, we walk the kitchen with you against the original scope. Every item gets checked and photographed. You receive the completed photo record and the written warranty before we leave. The 365-Day Done Right Promise covers the installation workmanship: if something isn’t right within that period, we make it right – that’s printed on the warranty, not summarized in a handshake.
Before
AfterCabinet Installation & Refacing Pricing in Oakland
Cabinet costs in Oakland vary more than most homeowners expect, primarily because the range of cabinet quality is wide and the labor involved in a proper installation doesn’t compress easily. Here are the honest ranges we work within, based on projects we’ve completed across Oakland:
| Scope | Typical Oakland Range | What Drives the Number |
|---|---|---|
| Cabinet refacing (standard kitchen, 10-15 linear feet) | $3,500 – $8,000 | Veneer material, door profile, hardware grade, number of drawer fronts |
| Semi-custom cabinet installation (10-15 linear feet) | $8,000 – $15,000 | Cabinet line selected, number of boxes, interior organization, finish complexity |
| Full custom cabinet installation (larger kitchen or complex layout) | $15,000 – $22,000+ | Custom sizing, specialty finishes, integrated lighting, pull-out systems throughout |
| Removal and haul-away of existing cabinets | $400 – $900 | Number of boxes, access, whether salvage is requested |
| Wall patching after cabinet removal | $200 – $600 | Extent of damage, number of penetrations to patch |
A few factors that move Oakland cabinet projects toward the higher end of their ranges: kitchens with non-standard ceiling heights common in pre-1960 Oakland bungalows often require filler panels or custom upper box sizing; homes in hillside neighborhoods like Joaquin Miller or Claremont sometimes have limited staging access that adds labor time; and kitchens being updated with cabinets & countertops require coordination sequencing that we build into the schedule and the price upfront.
We source cabinets from KraftMaid and Wellborn, both of which offer a range of door styles, finishes, and interior options that give a written quote honest numbers – neither line inflates a material cost to pad margin. The cabinet line goes on your written scope by name, so you can verify what you’re getting independently.
Every estimate is free. If you have a written quote from another contractor, bring it: we’ll review it line by line at no charge and tell you what we see, whether the number makes sense or not. Call (628) 300-4376 to schedule.
FAQs – Cabinet Installation & Refacing

How much does cabinet refacing cost in Oakland compared to full replacement?
Cabinet refacing in Oakland typically runs $3,500 to $8,000 for a standard kitchen, compared to $8,000 to $22,000 for full kitchen remodeling – so refacing can be 40 to 60 percent less expensive when your existing boxes are structurally sound. The key condition is the frame: if the boxes are plumb, the substrate hasn’t delaminated from water exposure, and the carcasses close square, refacing is a legitimate option. We check every box before recommending a path, and we’ll tell you plainly if a box we’re looking at shouldn’t be retained. Call (628) 300-4376 for a free assessment and written price.
Can you complete a cabinet installation or refacing project while we’re living in the kitchen?
Yes, for most Oakland kitchen cabinet projects the space is accessible again within one to two weeks, though there’s a period of a few days – typically during upper cabinet installation – where cooking access is limited. We sequence the work to minimize disruption: lowers go in after uppers so you have counter access as early as possible, and we establish a clear daily schedule before work starts so you know what each day looks like. For refacing projects, disruption is shorter – usually three to five working days for a standard kitchen. The written scope includes a project timeline, not just a price.
What’s the difference between semi-custom and custom cabinets, and which should I choose for an Oakland home?
Semi-custom cabinets – lines like KraftMaid and Wellborn – are built in set increments (usually 3-inch width steps) with a wide range of door styles, finishes, and interior configurations. They work well in the majority of Oakland kitchens because most layouts are designed around standard dimensions. Custom cabinets are sized to the exact inch and built to a specific kitchen design & layout, which matters most in kitchens with non-standard wall lengths, unusual ceiling heights, or high-end finish specifications that fall outside what semi-custom lines offer. For most Rockridge, Temescal, or Laurel kitchens we see, semi-custom hits the right balance between quality and cost. We’ll tell you honestly if your kitchen is a case where custom sizing pays for itself.
Does Rowan Construction Group handle the countertop work too, or just the cabinets?
We handle both, and coordinating them through a single contractor matters more than most homeowners realize. Cabinet installation sets the height and front-edge line that countertop templating depends on; if those two scopes are managed separately, small misalignments create real problems at the seam. Our Kitchen Remodeling in Oakland practice covers the full kitchen scope – cabinets, countertops, backsplash, and fixture coordination – under one written price and one project schedule. You deal with one point of contact, one signed agreement, and one warranty. If you want cabinets quoted alone, we can do that too; we’ll note on the scope what assumptions we’re making about countertop sequencing so nothing surprises you later.
Why Oakland Homeowners Choose Rowan for Cabinet Work
Since 2007, Rowan Construction Group has completed over 4,000 projects across the trades, every one of them with a written price before work started. Grant Rowan’s founding rule hasn’t changed: the quote is a flat price with a written scope, and no change proceeds without a signed change order. That discipline is what keeps projects within a few percent of the agreed cost even when a kitchen turns up surprises – and Oakland kitchens do turn up surprises, particularly older homes in the Dimond, Fruitvale, and North Oakland neighborhoods where the original construction involved materials and methods that don’t always show up in a visual inspection.
The documented photo record on every visit isn’t a sales feature; it’s evidence. If we open a wall to route a cabinet screw and find something worth noting, it’s photographed, described in plain terms, and added to your project record. You know what we found. You know what we did about it. That record is yours when the job is complete.
Our crews are background-checked and uniformed. A live person answers calls at any hour. And the 365-Day Done Right Promise covers the workmanship on every cabinet job we complete: if something isn’t right within that period, we come back and make it right. The terms are printed on the warranty, not deferred to an asterisk.
If you want to understand what a cabinet installation or refacing project looks like from our home base in Oakland, or if you have a written estimate from another contractor you’d like reviewed at no charge, call (628) 300-4376. The estimate is free. The price is in writing. And the number we give you is the number we build to.
Written by Grant Rowan, Owner at Rowan Construction Group Oakland, serving Oakland since 2007.







Before
After